Gambler Line
For all you shredders out there looking to work on your jumps, the Gambler line is currently under construction. Gambler 1 was built last night, but is waiting to be perfected. Gambler 2 was remodeled a couple days ago with a bigger lip, longer deck, and steeper landing. Plus, we still have the triple line on Lower Park Run, making for some serious jumping all the way down the mountain. The Gambler line is pretty good sized, so be sure to use Smart Style.
Here’s a pic of the first jump in the line. It will be open soon.
Filed Under: Terrain Park.
Tags: Bear, Bear Mountain, Bear Snow, Big Bear, Big Bear Snow, booters, Chair 9, features, Gambler, jumps, kickers, Park, Skiing, snow, snowboarding, terrain park features, terrian park


